quantity takeoff services
Outsourcing takeoffs: 12 questions to ask before you send your drawings
Thinking of outsourcing your quantity takeoffs? Twelve questions to ask a takeoff service first, the red flags, and how to test one on a job you know.
Guides
Plasterboard, painting and estimating from Australian drawings: how to measure it, what the standards and manufacturers say, and what gets missed. Each guide links its sources and was last checked on 19 October 2026.
quantity takeoff services
Thinking of outsourcing your quantity takeoffs? Twelve questions to ask a takeoff service first, the red flags, and how to test one on a job you know.
plasterboard takeoff
A step-by-step plasterboard takeoff method for Australian houses: walls, ceilings, openings, board types and linear items, with a fully worked example.
door and window schedule
How to use the door and window schedule in a plasterboard or painting takeoff: opening deductions, window reveals, architraves, unsized doors and when to raise an RFI.
wet area plasterboard
How to measure wet areas in a plasterboard takeoff in Queensland: which rooms, which boards, what the NCC Housing Provisions cover, and what the takeoff doesn’t decide.
painting takeoff
Measure interior painting by surface: walls less tiling, ceilings, doors and skirting. A practical painting takeoff method for Australian builders and painters.
square set vs cornice
Square set and cornice explained for builders: what each is, how to measure both in linear metres, what changes in the quote, and how to state it in your scope.
inclusions and exclusions in a quote
How to list inclusions, exclusions, assumptions and RFIs with your takeoff so scope gaps are priced or clarified before the quote goes out. With a template.
reflected ceiling plan
How to measure ceilings for a plasterboard takeoff: reading the reflected ceiling plan, heights from sections, voids, raked ceilings and bulkheads, with worked examples.
plasterboard sheet sizes
Australian plasterboard sheet sizes from the manufacturer, and how sheet width and length change joints and waste — with a worked example for a 2.7 m wall.
level 5 plaster finish
Plasterboard levels of finish under AS/NZS 2589: what Levels 3, 4 and 5 mean, when Level 5 is worth it, and how to show it in your takeoff and quote.
Founding places are limited: price held for 12 months, free corrections, 7-day terms.